Economic Powerhouse  Industry Leader  International Brand
MIAMI-DADE AVIATION DEPARTMENT (MDAD)
INDUSTRY DAY FOR SOUTH TERMINAL EXPANSION EAST
(NEW GATES) PHASE 1 AT MIA
When: Tuesday, December 5, 2023 @ 9:00am – 12 Noon
Where:
(In person and virtual)
Miami International Airport, North Terminal, Concourse D, 4
th
Floor Auditorium
Park in Dolphin Garage – 2100 NW 42
nd
Ave, Miami, FL 33142 – Map Attached
Note:
Attendee parking for this event will be validated by MDAD. Please bring parking ticket with you to session.
Abstract:
Miami-Dade Aviation Department has a need to establish a Design-Build Services contract for the expansion of the
existing MIA South Terminal and the design and construction of a new Concourse K with six (6) contact gates,
associated apron and jet fuel hydrant service, a ground support equipment (GSE) maintenance facility and
modifications to the existing Baggage Handling System (BHS) to provide for a crossover from the Central Terminal
to the South Terminal and the installation of two (2) new make- up (carousel) facilities in the new Concourse K.
The project is located east of the existing South Terminal.
Industry Day Objectives:
9 Ensure synergy between Miami-Dade Aviation Department and Industry representatives.
9 Incorporate Industry comments into the project development process.
9 Gain a better understanding of recent Industry developments.
9 Fostering and maintaining transparency.
Virtual Attendance Zoom Link:
https://miamidade.zoom.us/j/84801386655
Meeting ID: 848 0138 6655
Point of Contact:
Sylvia Novela, MDAD, Procurement & Materials Management Division Director 3
AUDITORIUM
IS LOCATED
IN CONCOURSE ‘D’
NORTH TERMINAL
LEVEL 4
PARK IN EITHER THE DOLPHIN OR
FLAMINGO GARAGE.
TAKE ELEVATOR TO 3RD LEVEL.
FIND“MOVING WALKWAY” ENTRANCE - TAKE
TO CONCOURSE D.
AT THE END OF CONCOURSE D, TURN LEFT,
THEN RIGHT, TAKE ESCALATOR TO 4TH LEVEL.